Optimized Systems performed construction period commissioning services for this 55,000 SF expansion project at the Girls, Inc. facility. The expansion included a new gymnasium with upper walking deck, medical facilities, a workout space and variety of multi-use areas that were needed to accommodate the enrollment of girls of various ages.
The project involved water source heat pumps, an energy recovery ventilation system, a new fluid cooler, a new boiler, a rooftop air handling unit and a variety of unitary equipment. An existing boiler with acceptable remaining life was re-purposed.
Optimized Systems also provided building Advocation services for a one-year period following construction to monitor building operations and organize a preventative maintenance program. Utility bills were also monitored to verify energy efficiencies.